Method statement for Erection of segmental Viaduct

Short Description:


Product Detail

Parameter

Mechanical Properties

Product Tags


  • Previous:
  • Next:

  • continuous threaded bar

    Nominal Diameter Diameter H B L Nominal Section Nominal Weight
    Dv Dh
    mm mm mm mm mm mm mm2 kg/m
    15 15 15 1.0 4.5 10 176 1.47
    18 18 18 1.0 4.0 10 254.5 2.11
    20 20 20 1.3 4.8 10 314 2.47
    25 25 25 1.6 6.0 12 490.9 4.10
    32 32 32 2.0 7.0 16 804.2 6.65
    36 36 36 2.5 8.0 18 1018 8.41
    40 40 40 3.0 8.0 20 1256.6 10.34
    50 50 50 3.0 9.0 24 1963.5 16.28
    60 60 60 3.0 10.0 22 2827 23.26
    63.5 63 63.5 3.0 12.0 22 3167 26.20
    65 65 65 3.0 12.0 22 3318 27.470
    70 70 70 3.0 12.0 22 3848 31.8
    75 75 75 3.0 12.0 22 4418 36.9
    Grade500/630 NominalDia. CrossSection YieldStrength TensileStrength YieldLoad UltimateLoad Elongation NominalWeight
    mm mm2 >=Mpa >=Mpa KN KN A/% KG/m
    20 314 500 630 157 198 10 2.47
    25 491 500 630 246 309 10 4.1
    28 615 500 630 308 387 10 4.83

    RELATED PRODUCTS